Amtrak Highlights 2014 Infrastructure Work

  • 0
  • March 10, 2014

Steve Kulm

Media Contact


202 906.3860
Steve.Kulm@Amtrak.com

Key projects include PTC, high-speed rail and ADA station accessibility

WASHINGTON – During 2014, Amtrak plans to move forward on key improvement projects, including continued installation of positive train control safety technology, the start of major construction to upgrade Northeast Corridor high-speed rail and expansion of station accessibility for passengers with disabilities.

“With limited federal capital funding we are doing the work that needs to be done to keep the railroad operating and taking action where we can to achieve safety, operational and passenger travel improvements,” said President and CEO Joe Boardman. “However, to truly realize the mobility and economic benefits offered by passenger rail, there must be dedicated federal funding to support a multi-year planning and construction program.”

POSITIVE TRAIN CONTROL

In 2014, Amtrak is continuing its aggressive program to install PTC on an additional 1,200 track-miles beyond the approximately 530 track-miles where it is already in operation on some Amtrak-owned sections of the Northeast Corridor and all of its Michigan Line. Amtrak is also taking action to obtain needed radio spectrum to transmit data critical to make PTC operational in the new areas. PTC safety technology can control train movements to prevent train-to-train collisions, derailments caused by excessive speed and certain human-caused incidents such as misaligned track switches. Amtrak is on target to meet a 2015 federal deadline.

NORTHEAST CORRIDOR HIGH-SPEED RAIL

In 2014, Amtrak is beginning major construction activities on a 23-mile section of the Northeast Corridor between Trenton and New Brunswick, N.J., to increase top train speeds to 160 mph from 135 mph and improve reliability along this heavily used section. The project will upgrade track and various elements of the electrical and signal systems to support the higher speeds and reconfigure track switches at Penn Station New York to mitigate congestion issues.

ADA STATION ACCESSIBILITY

In 2014, Amtrak will advance its Accessible Stations Development Program with continuation of existing construction work at eight stations in three states and new construction activities at 21 stations in eight additional states. In addition, necessary ADA-related design work will be completed for 61 stations in 20 states.

GATEWAY PROGRAM, BRIDGES AND TUNNELS

Amtrak will also move forward in 2014 on other infrastructure projects including: various planning elements of the Gateway Program to expand track, tunnel and station capacity between Newark, N.J., and Penn Station New York; ongoing construction of a concrete casement through the Hudson Yards commercial development project to preserve a possible pathway for a future Hudson River Tunnel into Manhattan; and design work for replacing major Northeast Corridor and century-old assets such as the Susquehanna River Bridge (Md.), the Pelham Bay Bridge (N.Y.), the Connecticut River Bridge (Conn.) and the B&P Tunnel (Md.).

OTHER INFRASTRUCTURE WORK

By the end of its 2014 maintenance program, Amtrak expects to install or replace nearly 165,000 cross ties, 23 miles of rail, and several dozen track switches, turnouts and interlockings. The railroad is also upgrading numerous sections of its electrical and signal systems along the Northeast and Keystone Corridors, and performing various maintenance projects on property it owns in Chicago, New Orleans and elsewhere in the country.

In addition, Amtrak forces will perform significant work as part of state-led projects to upgrade tracks and signal systems between Kalamazoo and Dearborn, Mich.; Poughkeepsie and Albany, N.Y.; and New Haven, Conn., and Springfield, Mass.

About Amtrak®

Amtrak is America’s Railroad®, the nation’s intercity passenger rail service and its high-speed rail operator. Amtrak and its state and commuter partners move people, the economy and the nation forward. Formally known as the National Railroad Passenger Corporation, Amtrak is governed by a nine member board of directors appointed by the President of the United States and confirmed by the U.S. Senate. Anthony R. Coscia is board chairman and Jeffrey R. Moreland is vice chairman. In FY 2014, nearly 31 million passengers traveled on Amtrak on more than 300 daily trains – at speeds up to 150 mph (241 kph) – that connect 46 states, the District of Columbia and three Canadian Provinces. Enjoy the journey® at Amtrak.com or call 800-USA-RAIL for schedules, fares and more information. Like us on Facebook, Follow us on Twitter (@Amtrak) and check out our blog at blog.amtrak.com.

Shares